This project involved the complete replacement of the existing boiler system at Sharlston Community School to improve heating efficiency and reliability across the premises. Our in-house Mechanical team took full responsibility for delivering a turnkey solution, starting with the safe decommissioning and removal of the outdated boilers and associated infrastructure.
In their place, we installed two new Alpha Protec boilers, expertly mounted on a newly fabricated framework. The installation included brand new flue systems and a modern pressurisation unit to ensure optimal performance and long-term reliability.
The project was delivered within an agreed timeframe to meet the specific needs of the school, minimising disruption and ensuring the new heating system was fully operational ahead of schedule.
As with all our mechanical projects, this was a full turnkey solution managed entirely by Redbrick FM – from initial strip-out to final commissioning – providing the client with a seamless and professional service throughout.